Construction of initial part of East Wing Breakwater with a total length 800m & an adjacent Dyke with length of 250m.
It also consists of following works:
- Completion the protection layer of West Wing Breakwater
- Demolishing of old East Wing Breakwater (125m length)
- Construction of 3 Commodity loading Jetties with total length of 577m and the associated wall with a length of 58m
- Construction of 2 Oil Jetties with a length of 180m each
- A 12 hectare soil improvement in reclamation area with dynamic compact method.