enfa

Asia Highway Project (EPC)

employer
Category Asia Highway Project (EPC)
Project Duration
After Before
Details
employer
Location
Start
Project Duration
Project Size
Project Description

This EPC Project consists of construction Highway with non-elevated cross sections, 23km ramp & loop, totally 26,000 m2 Bridges, and VESK canal. Total length of project is 6+580 km with 5 non-elevated cross sections

Project Details
Gallery
Geography Location

Location
 
// CONTACT US ICONS