The projects includes Construction of approximate 14.5 Km double carriageway road in all respects,
Tunneling works, Interchange in Shis area and Cloverleaf Interchange at Diftah, with the following quantities:
Tunnel Length (Total 6 spans): 7.72 Km
Excavation in Rock/Soil: 6 915 000 m3
Earthfill/Rockfill: 7 678 000 m3